Our process

Eight steps from first call to final walk

You should never wonder what is going on. Here is how every job works.

Ruler resting on a set of construction drawings
Plans and scope Ref. photo

The eight steps

  1. Step 1: Free site visit

    First, we talk about the building and what you see. Then we come out and look at it with you. We take photos and measure. This visit is free.

  2. Step 2: Written scope

    Every building is different, so we do not guess a price on the spot. We study our notes and photos. Then we write a plan for your building. This takes a few business days.

  3. Step 3: Pick materials

    If it fits the job, we show drawings and samples. Your board can see the result and pick materials that fit the building and the budget.

  4. Step 4: Sign the contract

    Once you like the plan, we send a contract you can sign online. A deposit lets us order materials and set the dates. Any added work needs your written OK first, unless there is an emergency or a safety risk.

  5. Step 5: Meet your project manager

    You get one project manager to call. On bigger jobs, we meet on site first. We go over the work, safety, access, and notices for residents.

  6. Step 6: Protect the site

    On day one, your project manager meets you on site. We cover AC units, plants, cars, windows, and shared areas. Then work begins.

  7. Step 7: Final walk

    When the work is done, we walk it with you. We list anything that still needs work and fix it. Then you get your closeout papers: warranty, lien releases, and inspection records.

  8. Step 8: Warranty support

    We stay with you after the job ends. If you have a warranty issue, we set up a visit within 72 hours. You need to be there for it. Then we find the right fix.

5-year workmanship warranty on every project. Have a warranty issue? We set up a visit within 72 hours.

During the work

How we keep you posted

  • 1

    project manager. One person to call.

  • Weekly

    meetings with you and your team

  • 24 hrs

    to tell you about any problem or delay

  • 2 weeks

    schedule ahead, updated every week

Every job gets one project manager. Weekly meetings, 24-hour reports, and the two-week schedule are for bigger jobs.

Proof, not promises

What you get from us

Records you can hand to your board. These are samples with fake data.

Sample

Daily Log

Day 12 · Tue

Property
Sample Community, Bldg C
Weather
84°F, PM showers, 1 hr rain delay
Crew
PM + 4 carpenters
Completed
Locations C-7, C-8: siding removed, sheathing replaced, WRB installed
Materials
6 sheets sheathing, 1 roll WRB, flashing tape
Notes
Openings dried in before rain. Area cleaned 4:30 PM.
Sample

Photo Report

Location C-7

Finding: Reverse lapped WRB at window head. Sheathing soft for 3 ft below.

Repair: Replaced sheathing, new WRB lapped shingle style, new head flashing.

Sample

Change Order #03

Pending approval

Condition found
Top plate deterioration extends 6 ft past approved repair area at C-8. Photos 41 to 44 attached.
Why it matters
Plate supports the wall above. Leaving it would compromise the new siding repair.
Proposed work
Replace 6 LF top plate and connectors per existing detail.
Cost / schedule
$X,XXX · +1 day

No work proceeds until this change order is approved in writing.

  • Photos before, during, and after, in a shared Google Drive folder
  • Daily logs of crew, weather, work done, and materials, on bigger jobs
  • 7 days notice before we start. 72 hours before a utility shutoff.
  • Changes in writing with photos. Never a surprise.
  • A kickoff meeting on bigger jobs, and a final walk with you
  • Closeout papers: warranty, lien releases, inspection records

Standards on every job

Safety, protection, and records

  • Photos

    Before, during, and after photos of every repair, in a shared Google Drive folder.

  • Daily logs

    On bigger jobs: crew, weather, work done, and materials used. Written down every work day.

  • Notice first

    You get 7 days notice before we start on a building, and 72 hours written notice before any utility shutoff.

  • Changes in writing

    Every change comes with photos and a reason. Never a surprise.

  • Start and finish meetings

    A kickoff meeting on bigger jobs. A final walk with you at the end.

  • Closeout papers

    Warranty papers, lien releases, and inspection records when we finish.

  • Safe sites

    Our supervisors hold OSHA 10 and OSHA 30 cards. Fences, barriers, and overhead cover keep residents safe.

  • Part of your team

    We work for your building the way your own staff would.

Site protection

  • We clean up every day
  • Work and storage areas are locked up
  • Nets, scaffolds, and barriers where needed
  • We cover windows, doors, cars, pools, walkways, plants, and grass

Materials and staging

  • You pick where materials go, in writing, before they arrive
  • We plan routes that protect walkways and plants
  • Materials stay off the ground and covered

Start with step one