Skip to content
DCS, Dewars Construction Services

Recent work

Before and after

New jobs are added as we finish them. We photograph every job before, during, and after.

Projects are on the way

New jobs are coming soon. Want to see photos of work like yours? Ask us.

Proof, not promises

What you get from us

Records you can hand to your board. These are samples with fake data.

Sample

Daily Log

Day 12 · Tue

Property
Sample Community, Bldg C
Weather
84°F, PM showers, 1 hr rain delay
Crew
PM + 4 carpenters
Completed
Locations C-7, C-8: siding removed, sheathing replaced, WRB installed
Materials
6 sheets sheathing, 1 roll WRB, flashing tape
Notes
Openings dried in before rain. Area cleaned 4:30 PM.
Sample

Photo Report

Location C-7

Finding: Reverse lapped WRB at window head. Sheathing soft for 3 ft below.

Repair: Replaced sheathing, new WRB lapped shingle style, new head flashing.

Sample

Change Order #03

Pending approval

Condition found
Top plate deterioration extends 6 ft past approved repair area at C-8. Photos 41 to 44 attached.
Why it matters
Plate supports the wall above. Leaving it would compromise the new siding repair.
Proposed work
Replace 6 LF top plate and connectors per existing detail.
Cost / schedule
$X,XXX · +1 day

No work proceeds until this change order is approved in writing.

Does your building need work?

Tell us what you see. We will come look for free and send you a written plan. No pressure.

Call (321) 758-3883 Free Site Inspection